Branch - Springhill Church Line substation interconnection queue

3 active projects totaling 833.5 MW in the Southern Company queue, plus 1 with terminal status (shown grayed).

4 Southern Company queue filings name Branch - Springhill Church Line as the point of interconnection, all in GA.

3active projects
833.5active MW
4total filed
Queue IDProjectkVMWResourceStatus
25-IC-1374 Not reported 230 600 Battery Active
IC-1193 Not reported 230 200 Solar Withdrawn
25-IC-1339 Not reported 230 165 Hybrid Active
IC-1176 Not reported 230 68.5 Solar Suspended

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.