Bonaire Primary - Eastman Primary Line substation interconnection queue

2 active projects totaling 240.2 MW in the Southern Company queue, plus 5 with terminal status (shown grayed).

7 Southern Company queue filings name Bonaire Primary - Eastman Primary Line as the point of interconnection, all in GA.

2active projects
240.2active MW
7total filed
Queue IDProjectkVMWResourceStatus
IC-624 Not reported 115 120.2 Solar Withdrawn
IC-768 Not reported 115 120.2 Solar Active
25-IC-1324 Not reported 115 120 Solar Active
IC-502 Not reported 115 68.5 Solar Withdrawn
IC-889 Not reported 115 30 Hybrid Withdrawn
IC-293 Not reported 115 20 Solar Withdrawn
IC-626 Not reported 115 20 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.