Substation Scout

Blakely Primary - George Dam (USA) Line substation interconnection queue

0 active projects totaling 0 MW in the Southern Company queue, plus 2 with terminal status (shown grayed).

2 Southern Company queue filings name Blakely Primary - George Dam (USA) Line as the point of interconnection, all in Clay County, GA.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
IC-836 Not reported 115 120 Hybrid Withdrawn
IC-603 Not reported 115 60 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.