Bio Substation Bus substation interconnection queue

0 active projects totaling 0 MW in the Southern Company queue, plus 2 with terminal status (shown grayed).

2 Southern Company queue filings name Bio Substation Bus as the point of interconnection, all in Hart County, GA.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
25-IC-AS Not reported 230 199 Battery Withdrawn
IC-622 Not reported 115 150 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.