Beulah (Gulf) - Silverhill Line substation interconnection queue
1 active project totaling 80 MW in the Southern Company queue, plus 4 with terminal status (shown grayed).
5 Southern Company queue filings name Beulah (Gulf) - Silverhill Line as the point of interconnection, all in Baldwin County, AL.
1active projects
80active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| IC-860 | Not reported | 230 | 400 | Other | Withdrawn |
| IC-879 | Not reported | 230 | 200 | Hybrid | Withdrawn |
| IC-924 | Not reported | 230 | 80 | Hybrid | Withdrawn |
| IC-997 | Not reported | 230 | 80 | Hybrid | Suspended |
| IC-998 | Not reported | 230 | 80 | Hybrid | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.