Autaugaville Substation Bus substation interconnection queue
0 active projects totaling 0 MW in the Southern Company queue, plus 7 with terminal status (shown grayed).
7 Southern Company queue filings name Autaugaville Substation Bus as the point of interconnection, all in Autauga County, AL.
0active projects
0active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| IC-108 | Not reported | 230 | 657 | Gas | Withdrawn |
| IC-207 | Not reported | 230 | 655 | Gas | Withdrawn |
| IC-208 | Not reported | 500 | 655 | Gas | Withdrawn |
| IC-211 | Not reported | 500 | 630 | Gas | Withdrawn |
| IC-808 | Not reported | 230 | 220 | Hybrid | Withdrawn |
| IC-912 | Not reported | 230 | 80 | Solar | Withdrawn |
| IC-913 | Not reported | 230 | 80 | Hybrid | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.