Bull Dog Solar
Southern Company queue ID IC-760
Bull Dog Solar (IC-760) was listed in the Southern Company interconnection queue at the end of 2025 as a 80 MW solar project in Warren County, GA, according to Berkeley Lab’s queue data file. Its status as of December 31, 2025 was “Operational”, with a proposed online date of November 1, 2021.
| Queue ID | IC-760 |
|---|---|
| Project name | Bull Dog Solar |
| Status (as published) | Operational |
| Substation | Not reported |
| Point of interconnection | Not reported |
| County | Warren |
| State | GA |
| Voltage | Not reported |
| Capacity | 80 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2021-11-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Warren, GA: 5 requests in the Southern Company queue, 2 active totaling 280 MW.
Tracked changes
Not tracked. Southern Company rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Southern Company |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | Operational |
| Queue date | 2018-12-06 |
| Interconnection agreement date | 2020-04-24 |
| Operational date | 2024-03-02 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.