Substation Scout

Blackwater Solar

Southern Company queue ID IC-742

Blackwater Solar (IC-742) was listed in the Southern Company interconnection queue at the end of 2025 as a 80 MW solar project in Ware County, GA, according to Berkeley Lab’s queue data file. Its status as of December 31, 2025 was “Operational”, with a proposed online date of May 1, 2023.

Queue IDIC-742
Project nameBlackwater Solar
Status (as published)Operational
SubstationNot reported
Point of interconnectionNot reported
CountyWare
StateGA
VoltageNot reported
Capacity80 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2023-05-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Ware, GA: 5 requests in the Southern Company queue, 2 active totaling 200 MW.

Tracked changes

Not tracked. Southern Company rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySouthern Company
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Operational
Queue date2018-10-22
Interconnection agreement date2020-01-30
Operational date2024-11-20

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first