Southern Company request 25-IC-1379

Southern Company queue ID 25-IC-1379

Queue request 25-IC-1379 was listed in the Southern Company interconnection queue at the end of 2025 as a 200 MW hybrid project in Butler County, AL, according to Berkeley Lab’s queue data file. The filing names Belleville-Greenville line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 15, 2028.

Queue ID25-IC-1379
Project nameNot reported
Status (as published)Active
SubstationBelleville-Greenville line
Point of interconnectionBelleville-Greenville 230 kV line
CountyButler
StateAL
Voltage230 kV
Capacity200 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-10-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Butler, AL: 1 request in the Southern Company queue, 1 active totaling 200 MW.

Tracked changes

Not tracked. Southern Company rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySouthern Company
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Queue date2025-04-17
Components (hybrid)Solar 200 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.