Substation Scout

Washington, AL interconnection queue

1 active project totaling 80 MW in the Southern Company queue, plus 6 with terminal status (shown grayed).

1active projects
80active MW
7total filed
Queue IDProjectkVMWResourceStatus
25-IC-AW Not reported 115 199 Solar Withdrawn
IC-841 Not reported 115 100 Hybrid Withdrawn
IC-1135 Not reported 115 80 Solar Withdrawn
IC-473 Not reported 230 80 Solar Withdrawn
IC-546 Not reported 115 80 Solar Withdrawn
IC-801 Not reported 115 80 Solar Withdrawn
IC-831 Not reported 115 80 Solar Suspended

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.