Tift, GA interconnection queue

1 active project totaling 88 MW in the Southern Company queue, plus 7 with terminal status (shown grayed).

1active projects
88active MW
8total filed
Queue IDProjectkVMWResourceStatus
IC-086 Not reported 500 640 Gas Withdrawn
IC-087 Not reported 230 640 Gas Withdrawn
IC-053 Not reported 230 620 Gas Withdrawn
IC-054 Not reported 500 620 Gas Withdrawn
IC-097 Not reported 500 550 Gas Withdrawn
IC-457 Not reported 115 164.5 Solar Withdrawn
25-IC-1384 Not reported 115 88 Hybrid Active
IC-483 Not reported 230 68.4 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.