Terrell, GA interconnection queue
0 active projects totaling 0 MW in the Southern Company queue, plus 9 with terminal status (shown grayed).
0active projects
0active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| IC-792 | Not reported | 115 | 200 | Hybrid | Withdrawn |
| 25-IC-1350 | Not reported | 115 | 150 | Hybrid | Withdrawn |
| IC-867 | Not reported | 115 | 150 | Solar | Withdrawn |
| IC-764 | Not reported | 115 | 120 | Solar | Withdrawn |
| IC-765 | Not reported | 115 | 120 | Solar | Withdrawn |
| IC-331 | Not reported | 115 | 82 | Solar | Withdrawn |
| IC-449 | Not reported | 115 | 56 | Solar | Withdrawn |
| IC-541 | Not reported | 46 | 40 | Solar | Withdrawn |
| IC-318 | Not reported | 115 | 19.2 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.