Terrell, GA interconnection queue

0 active projects totaling 0 MW in the Southern Company queue, plus 9 with terminal status (shown grayed).

0active projects
0active MW
9total filed
Queue IDProjectkVMWResourceStatus
IC-792 Not reported 115 200 Hybrid Withdrawn
25-IC-1350 Not reported 115 150 Hybrid Withdrawn
IC-867 Not reported 115 150 Solar Withdrawn
IC-764 Not reported 115 120 Solar Withdrawn
IC-765 Not reported 115 120 Solar Withdrawn
IC-331 Not reported 115 82 Solar Withdrawn
IC-449 Not reported 115 56 Solar Withdrawn
IC-541 Not reported 46 40 Solar Withdrawn
IC-318 Not reported 115 19.2 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.