Talladega, AL interconnection queue
2 active projects totaling 180 MW in the Southern Company queue, plus 7 with terminal status (shown grayed).
2active projects
180active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| IC-050 | Not reported | 230 | 1,800 | Gas | Withdrawn |
| IC-055 | Not reported | 230 | 888 | Gas | Withdrawn |
| IC-133 | Not reported | 230 | 828 | Gas | Withdrawn |
| IC-1173 | Not reported | 115 | 200 | Hybrid | Withdrawn |
| IC-1162 | Not reported | 115 | 100 | Solar | Suspended |
| IC-887 | Not reported | 115 | 80 | Hybrid | Withdrawn |
| IC-943 | Not reported | 115 | 80 | Solar | Suspended |
| IC-572 | Not reported | 46 | 59.5 | Solar | Withdrawn |
| IC-1011 | Not reported | 46 | 33.5 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.
Site Scanner