Talladega, AL interconnection queue

2 active projects totaling 180 MW in the Southern Company queue, plus 7 with terminal status (shown grayed).

2active projects
180active MW
9total filed
Queue IDProjectkVMWResourceStatus
IC-050 Not reported 230 1,800 Gas Withdrawn
IC-055 Not reported 230 888 Gas Withdrawn
IC-133 Not reported 230 828 Gas Withdrawn
IC-1173 Not reported 115 200 Hybrid Withdrawn
IC-1162 Not reported 115 100 Solar Suspended
IC-887 Not reported 115 80 Hybrid Withdrawn
IC-943 Not reported 115 80 Solar Suspended
IC-572 Not reported 46 59.5 Solar Withdrawn
IC-1011 Not reported 46 33.5 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.