Santa Rosa, FL interconnection queue

0 active projects totaling 0 MW in the Southern Company queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
IC-680 Not reported 115 74.9 Solar Withdrawn
IC-686 Not reported 115 50 Solar Withdrawn
IC-687 Not reported 115 50 Solar Withdrawn
IC-399 Not reported 115 40 Solar Withdrawn
IC-667 Not reported 115 40 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.