0 active projects totaling 0 MW in the Southern Company queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
IC-1089 Not reported 115 125 Solar Withdrawn
IC-688 Not reported 115 125 Solar Withdrawn
IC-1163 Not reported 115 110 Solar Withdrawn
IC-941 Not reported 115 110 Hybrid Withdrawn
25-IC-1335 Not reported 115 80 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.