Home / Southern Company / Counties / Mcduffie, GA
Mcduffie, GA interconnection queue
2 active projects
totaling 750 MW in the Southern Company queue, plus 4 with terminal status (shown grayed).
2 active projects
750 active MW
6 total filed
Queue ID Project kV MW Resource Status
25-IC-1311
Not reported
230
500
Battery
Active
IC-1018
Not reported
230
250
Solar
Withdrawn
IC-1183
Not reported
230
250
Solar
Withdrawn
IC-948
Not reported
115
250
Solar
Withdrawn
IC-950
Not reported
230
250
Solar
Active
IC-1209
Not reported
115
17.6
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Southern Company before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.