Macon, GA interconnection queue

1 active project totaling 80 MW in the Southern Company queue, plus 11 with terminal status (shown grayed).

1active projects
80active MW
12total filed
Queue IDProjectkVMWResourceStatus
IC-946 Not reported 230 165 Solar Withdrawn
IC-739 Not reported 115 150 Hybrid Withdrawn
IC-798 Not reported 115 150 Solar Withdrawn
IC-600 Not reported 115 135 Solar Withdrawn
IC-481 Not reported 115 98.1 Solar Withdrawn
IC-882 CPV Stagecoach Solar n/r 80 Solar Operational
IC-563 Not reported 115 71.4 Solar Withdrawn
IC-713 Not reported 115 52 Solar Withdrawn
IC-1010 Not reported 115 38 Solar Withdrawn
IC-304 Not reported 115 20 Solar Withdrawn
IC-582 Not reported 115 20 Solar Withdrawn
IC-865 Not reported 115 1.9 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.