Macon, AL interconnection queue

0 active projects totaling 0 MW in the Southern Company queue, plus 7 with terminal status (shown grayed).

0active projects
0active MW
7total filed
Queue IDProjectkVMWResourceStatus
25-IC-1367 Not reported 115 195 Solar Withdrawn
IC-401 Not reported 115 80 Solar Withdrawn
IC-930 Not reported 115 79 Hybrid Withdrawn
IC-647 Not reported 115 78.6 Solar Withdrawn
IC-555 Not reported 115 60 Solar Withdrawn
IC-556 Not reported 46 25 Solar Withdrawn
IC-269 Not reported 115 2 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.