Lowndes, GA interconnection queue

3 active projects totaling 89.8 MW in the Southern Company queue, plus 2 with terminal status (shown grayed).

3active projects
89.8active MW
5total filed
Queue IDProjectkVMWResourceStatus
IC-588 Not reported 115 52 Solar Withdrawn
IC-736 Moody AFB (+5.7 MW) n/r 46 Solar Operational
IC-661 GPC - Moody AFB Solar n/r 40.3 Solar Operational
IC-366 Not reported 69 20 Solar Withdrawn
IC-1199 Not reported 115 3.5 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.