Substation Scout

Jackson, FL interconnection queue

0 active projects totaling 0 MW in the Southern Company queue, plus 9 with terminal status (shown grayed).

0active projects
0active MW
9total filed
Queue IDProjectkVMWResourceStatus
IC-444 Not reported 230 295 Solar Withdrawn
IC-442 Not reported 230 212.7 Solar Withdrawn
IC-558 Not reported 230 74.9 Solar Withdrawn
IC-658 Not reported 115 74.9 Solar Withdrawn
IC-668 Not reported 115 74.9 Solar Withdrawn
IC-482 Not reported 115 74.5 Solar Withdrawn
IC-621 Not reported 115 74.5 Solar Withdrawn
IC-708 Not reported 115 74.5 Solar Withdrawn
IC-737 Not reported 115 50 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first