Henry, AL interconnection queue
0 active projects totaling 0 MW in the Southern Company queue, plus 8 with terminal status (shown grayed).
0active projects
0active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| IC-815 | Not reported | 115 | 220 | Hybrid | Withdrawn |
| IC-853 | Not reported | 115 | 220 | Hybrid | Withdrawn |
| 25-IC-1352 | Not reported | 115 | 148 | Hybrid | Withdrawn |
| IC-421 | Not reported | 115 | 80 | Solar | Withdrawn |
| IC-464 | Not reported | 46 | 39.3 | Solar | Withdrawn |
| IC-506 | Not reported | 46 | 20 | Solar | Withdrawn |
| IC-507 | Not reported | 46 | 20 | Solar | Withdrawn |
| IC-639 | Not reported | 46 | 20 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.