Substation Scout

Hancock, GA interconnection queue

4 active projects totaling 1,974.1 MW in the Southern Company queue, plus 10 with terminal status (shown grayed).

4active projects
1,974.1active MW
14total filed
Queue IDProjectkVMWResourceStatus
IC-244 Not reported 500 1,918 Gas Withdrawn
IC-243 Not reported 500 959 Gas Withdrawn
25-IC-1330 Not reported 500 759.1 Gas Active
IC-067 Not reported 500 630 Gas Withdrawn
IC-068 Not reported 500 630 Gas Withdrawn
25-IC-1374 Not reported 230 600 Battery Active
25-IC-1385 Not reported 500 450 Battery Active
25-IC-1386 Not reported 500 450 Battery Withdrawn
IC-1193 Not reported 230 200 Solar Withdrawn
IC-587 Not reported 230 176 Solar Withdrawn
25-IC-1339 Not reported 230 165 Hybrid Active
IC-586 Not reported 230 100 Solar Withdrawn
IC-637 Not reported 115 60 Solar Withdrawn
IC-577 Not reported 46 30 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.