Greene, AL interconnection queue
2 active projects totaling 394 MW in the Southern Company queue, plus 6 with terminal status (shown grayed).
2active projects
394active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| IC-863 | Not reported | 230 | 263.6 | Hybrid | Withdrawn |
| 25-IC-1356 | Not reported | 115 | 199 | Hybrid | Active |
| 25-IC-1365 | Not reported | 115 | 195 | Solar | Active |
| IC-1171 | Not reported | 115 | 80 | Hybrid | Withdrawn |
| IC-499 | Not reported | 115 | 80 | Solar | Withdrawn |
| IC-763 | Not reported | 115 | 80 | Solar | Withdrawn |
| IC-468 | Not reported | 115 | 78.9 | Solar | Withdrawn |
| IC-418 | Not reported | 44 | 19.7 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.