Substation Scout

Floyd, GA interconnection queue

3 active projects totaling 265 MW in the Southern Company queue, plus 10 with terminal status (shown grayed).

3active projects
265active MW
13total filed
Queue IDProjectkVMWResourceStatus
IC-078 Not reported 230 564 Gas Withdrawn
IC-113 Not reported 230 556 Gas Withdrawn
IC-106 Not reported 230 508 Gas Withdrawn
IC-024 Not reported 230 320 Gas Withdrawn
IC-823 Not reported 230 225 Solar Withdrawn
IC-824 Not reported 230 225 Solar Withdrawn
25-IC-1314 Not reported 230 192.5 Battery Active
IC-1143 Not reported 115 175 Battery Withdrawn
25-IC-1331 Not reported 115 150 Battery Withdrawn
25-IC-AP Not reported 115 140 Battery Withdrawn
IC-1270 Not reported 230 100 Solar Withdrawn
IC-1267 Not reported 230 57.5 Battery Active
IC-1280 Not reported 115 15 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first