3 active projects totaling 274 MW in the Southern Company queue, plus 2 with terminal status (shown grayed).

3active projects
274active MW
5total filed
Queue IDProjectkVMWResourceStatus
IC-472 Not reported 230 200 Solar Withdrawn
25-IC-1383 Not reported 230 199 Hybrid Active
IC-312 Albany Green Energy n/r 44 Other Operational
IC-406 MCLB Solar n/r 31 Solar Operational
IC-405 Not reported 115 29.4 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.