3 active projects totaling 390.2 MW in the Southern Company queue, plus 11 with terminal status (shown grayed).

3active projects
390.2active MW
14total filed
Queue IDProjectkVMWResourceStatus
IC-096 Not reported 500 520 Coal Withdrawn
25-IC-1323 Not reported 230 150 Solar Active
IC-624 Not reported 115 120.2 Solar Withdrawn
IC-768 Not reported 115 120.2 Solar Active
25-IC-1324 Not reported 115 120 Solar Active
IC-921 Not reported 115 100 Hybrid Withdrawn
IC-336 Not reported 230 80 Solar Withdrawn
IC-502 Not reported 115 68.5 Solar Withdrawn
IC-778 Not reported 115 50 Solar Withdrawn
IC-513 Not reported 115 42.5 Solar Withdrawn
IC-335 Not reported 115 35 Solar Withdrawn
IC-889 Not reported 115 30 Hybrid Withdrawn
IC-293 Not reported 115 20 Solar Withdrawn
IC-338 Not reported 46 18.5 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.