Substation Scout

Decatur, GA interconnection queue

7 active projects totaling 1,149.9 MW in the Southern Company queue, plus 16 with terminal status (shown grayed).

7active projects
1,149.9active MW
23total filed
Queue IDProjectkVMWResourceStatus
IC-046 Not reported 230 550 Gas Withdrawn
IC-862 Not reported 230 400 Hybrid Withdrawn
25-IC-AD Not reported 230 300 Hybrid Withdrawn
IC-789 Not reported 230 260.1 Solar Active
IC-703 Cool Springs n/r 213 Hybrid Operational
IC-732 Decatur Solar n/r 200 Solar Operational
IC-833 Not reported 230 200 Hybrid Withdrawn
IC-441 Not reported 230 188.9 Solar Active
IC-692 Not reported 115 130 Solar Withdrawn
IC-966 Not reported 230 130 Hybrid Active
IC-467 Not reported 230 118 Solar Withdrawn
IC-436 Not reported 115 100 Solar Withdrawn
IC-437 Not reported n/r 100 Solar Withdrawn
IC-438 Not reported 115 100 Solar Withdrawn
IC-439 Not reported 115 100 Solar Withdrawn
IC-840 Not reported 115 100 Solar Withdrawn
IC-341 Not reported 115 79.9 Solar Withdrawn
IC-347 Decatur County Solar - Part II n/r 79.9 Solar Operational
IC-432 Not reported 115 78.6 Solar Withdrawn
IC-1002 Not reported 115 78 Solar Suspended
IC-471 Not reported 115 52 Solar Withdrawn
IC-327 Not reported 115 50 Solar Withdrawn
IC-297 Not reported 115 18.9 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.