Dallas, AL interconnection queue
2 active projects totaling 160 MW in the Southern Company queue, plus 8 with terminal status (shown grayed).
2active projects
160active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| IC-817 | Not reported | 115 | 220 | Solar | Withdrawn |
| IC-855 | Not reported | 115 | 220 | Hybrid | Withdrawn |
| IC-1242 | Not reported | 115 | 100 | Solar | Withdrawn |
| IC-1039 | Not reported | 115 | 80 | Solar | Suspended |
| IC-1075 | Not reported | 115 | 80 | Solar | Suspended |
| IC-498 | Not reported | 115 | 80 | Solar | Withdrawn |
| IC-885 | Not reported | 115 | 80 | Hybrid | Withdrawn |
| IC-479 | Not reported | 115 | 79.2 | Solar | Withdrawn |
| IC-422 | Not reported | 115 | 78.5 | Solar | Withdrawn |
| IC-417 | Not reported | 115 | 19.7 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.