Substation Scout

Dallas, AL interconnection queue

2 active projects totaling 160 MW in the Southern Company queue, plus 8 with terminal status (shown grayed).

2active projects
160active MW
10total filed
Queue IDProjectkVMWResourceStatus
IC-817 Not reported 115 220 Solar Withdrawn
IC-855 Not reported 115 220 Hybrid Withdrawn
IC-1242 Not reported 115 100 Solar Withdrawn
IC-1039 Not reported 115 80 Solar Suspended
IC-1075 Not reported 115 80 Solar Suspended
IC-498 Not reported 115 80 Solar Withdrawn
IC-885 Not reported 115 80 Hybrid Withdrawn
IC-479 Not reported 115 79.2 Solar Withdrawn
IC-422 Not reported 115 78.5 Solar Withdrawn
IC-417 Not reported 115 19.7 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first