Covington, AL interconnection queue

0 active projects totaling 0 MW in the Southern Company queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
IC-089 Not reported 230 640 Gas Withdrawn
IC-083 Not reported 230 620 Gas Withdrawn
IC-939 Not reported 230 80 Hybrid Withdrawn
IC-940 Not reported 230 80 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.