Home / Southern Company / Counties / Brooks, GA
Brooks, GA interconnection queue
2 active projects
totaling 300 MW in the Southern Company queue, plus 5 with terminal status (shown grayed).
2 active projects
300 active MW
7 total filed
Queue ID Project kV MW Resource Status
IC-847
Not reported
230
175
Hybrid
Withdrawn
IC-1033
Not reported
230
150
Solar
Withdrawn
IC-608
Quitman Solar
n/r
150
Solar
Operational
IC-649
Not reported
230
150
Solar
Withdrawn
IC-678
Quitman II
n/r
150
Solar
Operational
IC-674
Not reported
230
75
Solar
Withdrawn
IC-376
Not reported
69
20
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Southern Company before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.