Yankee Substation substation interconnection queue

2 active projects totaling 200 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
200active MW
3total filed
Queue IDProjectkVMWResourceStatus
G176 Not reported n/r 100 Wind Operational
G255 Not reported n/r 100 Wind Operational
G663 Not reported 34.5 20 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.