Xenia substation interconnection queue

2 active projects totaling 300 MW in the MISO queue.

2 MISO queue filings name Xenia as the point of interconnection, all in Clay County, IL.

2active projects
300active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2379 Not reported n/r 200 Battery Active
J2197 Not reported n/r 100 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.