0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name Xcel Paynesville Substation as the point of interconnection, all in Stearns County, MN.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
H048
Not reported
69
50
Wind
Withdrawn
H058
Not reported
69
45
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.