0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name Xcel Goodhue Substation as the point of interconnection, all in Goodhue County, MN.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
J179
Not reported
69
47.5
Wind
Withdrawn
J180
Not reported
69
39
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.