0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name Wishek Substation as the point of interconnection, all in Mcintosh County, ND.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
G624
Not reported
115
150
Wind
Withdrawn
J929
Not reported
41.6
25
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.