Winnfield to Standard substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Winnfield to Standard as the point of interconnection, all in Winn Parish, LA.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1868 Not reported 115 260 Solar Withdrawn
J1869 Not reported 115 78 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.