Winco - Winnebago substation interconnection queue
1 active project totaling 36 MW in the MISO queue, plus 1 with terminal status (shown grayed).
1active projects
36active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G695 | Not reported | 161 | 200 | Wind | Withdrawn |
| G358 | Not reported | 161 | 36 | Wind | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.