Whittemore to Twining substation interconnection queue

1 active project totaling 175 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Whittemore to Twining as the point of interconnection, all in Arenac County, MI.

1active projects
175active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2876 Not reported 138 175 Solar Active
J2671 Not reported 138 150 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.