0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name Wheatland Substation as the point of interconnection, all in Knox County, IN.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
J1637
Not reported
345
150
Solar
Withdrawn
J2063
Not reported
345
100
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.