Substation Scout

Wheatland - AMO substation interconnection queue

2 active projects totaling 280 MW in the MISO queue.

2 MISO queue filings name Wheatland - AMO as the point of interconnection, all in Knox County, IN.

2active projects
280active MW
2total filed
Queue IDProjectkVMWResourceStatus
G675 Not reported 345 200 Coal Operational
G674 Not reported 345 80 Coal Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first