West Memphis substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name West Memphis as the point of interconnection, all in Crittenden County, AR.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2596 Not reported 500 200 Solar Withdrawn
J2597 Not reported 500 100 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.