West Bay - Centennial substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name West Bay - Centennial as the point of interconnection, all in Beauregard Parish, LA.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2441 Not reported 138 250 Solar Withdrawn
J2543 Not reported 138 175 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.