Werner West substation interconnection queue

1 active project totaling 150 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3 MISO queue filings name Werner West as the point of interconnection, all in Outagamie County, WI.

1active projects
150active MW
3total filed
Queue IDProjectkVMWResourceStatus
J2148 Not reported 138 200 Solar Withdrawn
J2326 Not reported n/r 150 Battery Active
J2074 Not reported 138 100 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.