WEBB substation interconnection queue

1 active project totaling 100 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name WEBB as the point of interconnection, all in Tallahatchie County, MS.

1active projects
100active MW
2total filed
Queue IDProjectkVMWResourceStatus
J4064 Not reported n/r 200 Wind Withdrawn
S1116 Surplus; J908 n/r 100 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.