0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Webb as the point of interconnection, all in Tallahatchie County, MS.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2964 Not reported 115 220 Wind Withdrawn
J2391 Not reported 115 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.