Substation Scout

Waterford substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 4 with terminal status (shown grayed).

4 MISO queue filings name Waterford as the point of interconnection, all in St. John The Baptist Parish, LA.

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
J1797 Not reported 230 100 Solar Withdrawn
R1033 Replacing 100 MW of gas generation with solar generation; Tidelands 230 100 Hybrid Withdrawn
J1956 Not reported 230 60 Battery Withdrawn
J1958 Not reported 230 60 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first