Walton Substation substation interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 3 with terminal status (shown grayed).

4 MISO queue filings name Walton Substation as the point of interconnection, all in Cass County, IN.

1active projects
200active MW
4total filed
Queue IDProjectkVMWResourceStatus
J1741 Not reported 345 270 Solar Withdrawn
J992 Not reported 230 200 Solar Active
J1680 Not reported 345 100 Solar Withdrawn
J1692 Not reported 345 65 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.