3 active projects totaling 290 MW in the MISO queue, plus 1 with terminal status (shown grayed).

4 MISO queue filings name Vacherie Substation as the point of interconnection, all in St. James Parish, LA.

3active projects
290active MW
4total filed
Queue IDProjectkVMWResourceStatus
J1431 Not reported 230 200 Solar Active
J516 Not reported 230 100 Solar Withdrawn
J1158 Not reported 230 70 Solar Active
J1142 Not reported 230 20 Solar Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.