Tri-County Substation substation interconnection queue

2 active projects totaling 200 MW in the MISO queue.

2 MISO queue filings name Tri-County Substation as the point of interconnection, all in Morton County, ND.

2active projects
200active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2097 Not reported 230 100 Wind Active
J2157 Not reported 230 100 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.