Trenton Channel Power Plant substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Trenton Channel Power Plant as the point of interconnection, all in Wayne County, MI.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J423 Not reported n/r 125 Gas Withdrawn
J424 Not reported n/r 120 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.