Trenton Channel Power Plant substation interconnection queue
0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name Trenton Channel Power Plant as the point of interconnection, all in Wayne County, MI.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
J423
Not reported
n/r
125
Gas
Withdrawn
J424
Not reported
n/r
120
Gas
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.